Financing a new build: house and land, off the plan or rebuild

Published 2 October 2026 · Updated 2 October 2026 · 7 min read · By Shane Heness, mortgage broker

From 1 July 2027 negative gearing on residential property is limited to new builds, so investors who never wanted to build are now pricing one. There are three realistic routes: house and land on two contracts, off the plan, or a rebuild. Only two of them reliably qualify. A rebuild that replaces one house with one house adds no dwelling, and on the draft rules it does not qualify. House and land saves roughly $15,750 in NSW transfer duty on a $750,000 project and then hands most of it back in interest before a tenant moves in. Off the plan costs nothing to carry and exposes you to a valuation two years away.

Since the package passed in June the investor conversation in our office has changed shape. People have stopped arguing about whether the change is real and started asking what they should build instead. That is the right question, and it has three realistic answers. A fortnight ago I wrote about what the change did to borrowing capacity. This one is about where you put the money.

This article is about the finance, because that is my job. Whether a particular purchase qualifies for the exemption is a tax question for your accountant, and the detailed definition is still in draft. What I can tell you is what each route costs to fund, how long your money sits there before anyone pays you rent, and which one lenders make easy.

What actually counts as a new build

The Treasury Laws Amendment (Tax Reform No. 1) Bill 2026 passed parliament on 25 June 2026. From 1 July 2027, net rental losses on residential property acquired after 7:30pm AEST on 12 May 2026 can only be offset against other residential property income, with excess losses carried forward indefinitely. Property held at the announcement is grandfathered. New builds are carved out.

The part that matters for a building decision is the definition of a new residential dwelling, and that is still being settled in a second tranche. Treasury consulted on the exposure draft between 3 and 21 August 2026. The draft sets out four ways a dwelling qualifies: it is built on land that had no residential dwelling on it; it increases the number of dwellings on land already owned; it is acquired within 24 months of the occupancy certificate first being issued and was a new residential dwelling to the seller; or a non residential building is converted into one or more dwellings.

Read that second category again, because it catches people. A rebuild that replaces one house with one house does not increase the number of dwellings, so on the draft rules it does not qualify. Demolish one house and build a duplex and it does. That makes the exemption a planning decision as much as a finance one, and it is the most expensive thing on this page to get wrong.

The three routes, side by side

Here is how they compare on the things that actually drive a lending decision.

New build routes and how they fund
RouteNew build on the draft rules?How it fundsWhat bites
House and land, registered land, two contractsYesLand settles first, construction loan drawn in stagesInterest on the land while nothing is built
House and land, unregistered landYesNothing settles until titles registerRegistration slips three to six months and your approval expires
Off the plan apartment or townhouseYesOne loan, drawn in full at settlementValuation at completion, 12 to 36 months away
Completed new dwelling, within 24 months of its occupancy certificateYesStandard investment loanConfirm the certificate date before you exchange
Rebuild, one house replaced by one houseNoConstruction loanNo exemption, so the reason for building disappears
Rebuild or subdivision that adds a dwellingYesConstruction loan, often with a subdivision conditionCouncil timeframes and a harder valuation

Tax treatment reflects the exposure draft released for consultation between 3 and 21 August 2026 and is not final. Finance structures are the general position across the LoanBuddy panel at October 2026. Confirm the tax position with your accountant.

Our knockdown rebuild article from July still holds on the lending mechanics, but the arithmetic underneath it has moved. If you were planning a like for like rebuild on an investment property partly for the gearing, that plan needs another look before you sign a demolition contract.

What each route costs before a tenant moves in

Lenders will quote you a rate. They will not quote you the holding cost, and on a build that is the number that hurts. Take a $750,000 project in Western Sydney at 80 per cent lending.

Indicative cost to get to a paying tenant, $750,000 project
 Established dwellingHouse and landOff the plan
Price$750,000$400,000 land plus $350,000 build$750,000
NSW transfer duty$27,937$12,187$27,937
When duty falls dueAbout 3 months after exchangeAbout 3 months after the land contractAbout 3 months after exchange
Loan interest before first rentAbout one monthAbout $34,000Nil until settlement
Time to first rent6 to 12 weeks12 to 18 months12 to 36 months
Negatively geared after 1 July 2027NoYesYes

Transfer duty calculated on the Revenue NSW rates applying in 2026-27. Interest estimated at 6.50 per cent on drawn balances over a 15 month build, indicative across the LoanBuddy panel at October 2026. Your figures will differ.

Two things jump out. The two contract structure saves about $15,750 in duty, because duty is charged on the land contract and not on the building contract. It then hands most of that back in interest, because you carry the land from the day it settles and nothing is paying you rent.

Off the plan looks cheapest on that table, and it is, right up until the valuation. The lender values at completion, not at exchange. If a $750,000 apartment values at $700,000 two years later, an 80 per cent lend falls from $600,000 to $560,000 and you find the other $40,000 in cash or wear lenders mortgage insurance. Your approval will have expired as well. Approvals run three to six months and off the plan settlements run 12 to 36, so you are reassessed on the income, rates and policy that exist at settlement rather than the ones that existed when you signed.

Where the money actually goes during a build

On a construction loan you pay interest only on what has been drawn, not on the approved limit. Funds release in stages against the builder's invoices and a valuer's inspection, broadly slab, frame, lock up, fixing and practical completion, at roughly 15 to 20 per cent, 20 per cent, 20 per cent, 30 per cent and 10 per cent of the build contract. Our article on how drawdowns actually work walks through the paperwork at each stage. The trap is the clock. Most lenders allow 12 months from the first progress draw and the majors allow 24, and extensions are assessed case by case rather than granted automatically. A build that runs long leaves you paying interest with no rent and no certainty.

Which route suits which investor

  • Cash to spare and patience, and you want the duty saving: house and land on registered land. Avoid unregistered lots unless you can carry a six month delay without stress.
  • Tight on cash now, stronger later: off the plan, because nothing is drawn until settlement. Budget for a valuation shortfall and have a solicitor review the contract.
  • You already own the land and the zoning allows a second dwelling: a rebuild or subdivision that adds a dwelling, which qualifies where a like for like rebuild does not.
  • You want a tenant this quarter: a completed new dwelling bought within 24 months of its occupancy certificate. Get the certificate date in writing before you exchange.

Two things to check before you sign

First, duty. NSW lets you defer transfer duty on an off the plan purchase for up to 12 months, and investors keep assuming that applies to them. It does not. At least one buyer has to move in within 12 months of completion and live there as their principal place of residence for a continuous 12 months, and Revenue NSW is explicit that the deferral is not available for investment properties or where any purchaser is a foreign person. On an investment purchase, plan on duty about three months after exchange.

Second, the rate you model. The cash rate moved to 4.60 per cent on 29 September 2026, the fourth rise this year, and lenders started passing it through in early October. If you are modelling a build that finishes in late 2027, do not model it at today's rate, and check that the loan still services at the lender's assessment rate rather than the headline one.

The thing I would most like investors to avoid is letting the tax tail wag the dog. A new build in a weak location bought for an exemption is still a poor purchase. But where the numbers do work, the route you choose moves your duty bill, your holding cost and your settlement risk by tens of thousands of dollars. Our construction loans page sets out how we structure the funding and our investment loans page covers the servicing side. If you want it run against your own figures, book a free call.

Frequently asked questions

Only if it increases the number of dwellings on the land. Under the exposure draft released for consultation in August 2026, a new residential dwelling includes construction on land that had no dwelling, a project that increases the dwelling count, acquisition within 24 months of the occupancy certificate first being issued, and conversion of a non residential building. Demolishing one house and building one house does not add supply, so it does not qualify. Demolishing one house and building a duplex does. The definition is still in draft, so confirm it with your accountant before you commit.
They are expensive in different places. On a $750,000 project in NSW, a two contract house and land package attracts transfer duty on the land only, which on 2026-27 rates is about $12,187 instead of about $27,937, a saving of roughly $15,750. You then pay interest on the land and on each progress draw for the whole build, which on a 15 month timeline at an indicative 6.50 per cent is around $34,000 with no rent coming in. Off the plan reverses that: full duty, but nothing is drawn until settlement.
No. The NSW off the plan deferral lets you postpone transfer duty for up to 12 months, but at least one buyer must move in within 12 months of completion and live there as their principal place of residence for a continuous 12 months. Revenue NSW states the deferral is not available for investment properties, holiday homes or commercial properties, and it is not available if any purchaser is a foreign person. On an investment purchase, plan on duty falling due about three months after exchange.
The lender advances against the valuation at completion, not your contract price. On a $750,000 contract at 80 per cent lending you would expect $600,000. If it values at $700,000 the lender advances $560,000 and you cover the $40,000 gap in cash or accept a higher loan to value ratio and lenders mortgage insurance. Your original approval will also have expired, because approvals run three to six months and off the plan settlements run 12 to 36, so you are reassessed on the rates and policy at settlement.
Shane Heness, mortgage broker at LoanBuddy
Written by Shane Heness

Owner and mortgage broker at LoanBuddy, Parramatta NSW. Eight years as a mortgage broker and a property investor since 2015. Credit Representative #528658 under Australian Credit Licence #389328.

Thinking about building rather than buying?

Book a free call. No fee in most cases, and no obligation.

Book a Free Call Construction loans
Client Reviews

Trusted by clients across NSW and Australia-wide

Rated 5.0 from 102 Google reviews. Pulled live from Google, always current.

5.0
102 Google reviews
Read them on Google
Justin Kors3 months ago

We honestly couldn’t recommend Shane highly enough. From the very beginning, Shane guided us through every step of the process with...

Read full review
Liam Jalilian3 months ago

I had an excellent experience working with LoanBuddy (Shane) mortgage broker. From the beginning, he was professional, knowledgeable...

Read full review
Chelyn Bakera month ago

Absolutely outstanding service. My mortgage broker Shane was knowledgeable, responsive, and made the entire process smooth and...

Read full review
georgia gough6 months ago

We originally moved to Shane based on a recommendation, and it was one of the best decisions we’ve made. From the start, he’s been...

Read full review
Batool raza8 months ago

I’m extremely happy with my experience working with Shane. From the very beginning, they were professional, knowledgeable, and...

Read full review

Reviews from Google. See all reviews for LoanBuddy on Google.